Position Vibro-Brick beneath the equipment, support frame or service installation at the designated load-bearing points.
Where mechanical fixing is required, secure the mount using an M8 fixing through the central hole. Ensure the supporting surface is stable, level and capable of carrying the intended load.
Distribute loads evenly across all support points to maximise vibration isolation performance and avoid excessive localised loading.
For rooftop installations, ensure the mount is correctly positioned to provide stable support while maintaining separation from surrounding structural elements and avoiding unnecessary acoustic bridges.