Install Vibro-HF hangers at the specified suspension points according to the project layout and load distribution requirements.
Secure the hanger to the structural support using suitable fixings and connect the suspended system using an M8 threaded rod or compatible suspension hardware.
Select the appropriate isolation grade based on the supported load to ensure correct vibration isolation performance and balanced load distribution across all hangers.
For acoustic ceiling installations, ensure metal framing remains isolated from perimeter walls and adjacent structures to prevent acoustic bridges. Where specified, install acoustic insulation and membranes in accordance with the ceiling system design.