Install Vibro-LSM hangers at the designated suspension points according to the ceiling or equipment support layout.
Secure the hanger to the structural support using appropriate fixings and connect the suspended ceiling framework, pipework, ductwork, or equipment to the lower fixing point.
Ensure loads are distributed evenly across all hangers and that suspension points are spaced in accordance with the project design requirements.
The isolated pass-through fixing system must remain free from rigid contact with the steel frame to maintain vibration isolation performance and prevent acoustic bridges.
For acoustic ceiling installations, perimeter framing should remain isolated from surrounding walls and structural elements.