Position Vibro-SH.F isolators according to the installation layout and load distribution plan for the suspended system.
Secure the upper fixing point to the structural ceiling to ensure correct spacing and stable anchoring of each isolator.
Adjust the suspension rod to achieve the required level and ensure even load distribution across all isolators.
Verify alignment with the suspended ceiling framework or service system before final tightening. Care should be taken to avoid rigid acoustic bridges between the structure and suspended elements.